We were contacted by an Architect who was designing and creating a Loading Dock system for a
Community College in Dayton Ohio in an area where no loading dock had existed. One unique design
element of this system is it combined a custom designed, high-capacity structural mezzanine (a material
handling equipment product) with standard loading dock products.
![Mezzanine Loading Dock](https://mmhonline.com/wp-content/uploads/2023/11/Scan13657-1024x692.jpg)